Georgia

~150 facilities9% of facilities tracked here

The headline number

#1

fastest-growing US data center market by new capacity under construction in the mid-2020s (Atlanta metro)

Water stress

Moderate: metro Atlanta has fought two states over water rights for decades; new hyperscale demand lands on a system already in litigation.

The local story

Atlanta became the surprise winner of the AI land rush: cheap land, fiber density and Georgia Power's willingness to contract gigawatts pulled QTS, Microsoft, Meta and a dozen wholesale operators into Fulton, Douglas and Newton counties.

Water makes it complicated. Metro Atlanta draws from the Chattahoochee system at the center of the decades-long tri-state 'water wars' with Alabama and Florida. Local reporting put one QTS campus's permitted draw near a million gallons a day, and several counties have since added data-center-specific water conditions to zoning approvals.

Georgia is the state to watch for the political question: in 2024-25 its legislature debated suspending data center tax incentives partly over water and grid impacts, the first such reversal attempt in a major market.

Cite this pagev1.3.1 · 2026-09

Your number

What does your AI actually use?

Pick your model, set your usage, get the number, with sources.

Try the calculator

Sources

Cited on this page, in order of appearance.

  1. 1Shehabi, A., Smith, S. J., Hubbard, A., et al. (2024). 2024 United States Data Center Energy Usage Report. Lawrence Berkeley National Laboratory, LBNL-2001637: 176 TWh electricity and 17B gal direct water in 2023, with 2028 projections. (accessed 2026-06) government
  2. 2Siddik, M. A. B., Shehabi, A., & Marston, L. (2021). The environmental footprint of data centers in the United States. Environmental Research Letters 16(6): watershed-scale direct + indirect water footprint. (accessed 2026-06) peer-reviewed
  3. 3Local utility filings and news reporting (2025). Aggregated local reporting on individual data center campuses. Utility filings and local journalism on per-site water demand (Memphis, West Des Moines, The Dalles, Bluffdale, metro Atlanta), used where ESG reports do not break sites out. (accessed 2026-09) news