The headline number
120+
facilities in a state whose Colorado River allocation was just cut, the sharpest siting paradox in the country
Water stress
Severe: Phoenix sits in a structural Colorado River deficit with groundwater pumping limits; evaporative cooling is maximally effective and maximally contested here.
The local story
Phoenix's east and west valleys (Mesa, Chandler, Goodyear) drew Microsoft, Meta, Google and Apple campuses for the same reasons chips fabs came: cheap power, dry air, low seismic risk. Dry air is the catch: evaporative cooling works brilliantly and costs the most where water is scarcest.
The flashpoints are documented: Mesa approved Google's campus with council members openly debating whether millions of gallons a day was an acceptable trade; Goodyear's agreement with Microsoft included funding for city water infrastructure. Several newer permits require dry cooling above specified temperatures.
Arizona is also where 'follow the grid' matters most: Palo Verde nuclear plant (the country's largest, cooled with reclaimed wastewater) supplies much of the load, a genuinely lower-water electricity mix than the US average. Low vs Mid scenarios diverge unusually far here.
Cite this pagev1.3.1 · 2026-09
Your number
What does your AI actually use?
Pick your model, set your usage, get the number, with sources.
Sources
Cited on this page, in order of appearance.
- 1Shehabi, A., Smith, S. J., Hubbard, A., et al. (2024). 2024 United States Data Center Energy Usage Report. Lawrence Berkeley National Laboratory, LBNL-2001637: 176 TWh electricity and 17B gal direct water in 2023, with 2028 projections. (accessed 2026-06) government
- 2Siddik, M. A. B., Shehabi, A., & Marston, L. (2021). The environmental footprint of data centers in the United States. Environmental Research Letters 16(6): watershed-scale direct + indirect water footprint. (accessed 2026-06) peer-reviewed