How much water do Google and Gemini use?
Google discloses more water data than any other AI company: about 7.7 billion gallons across its data centers in 2024, and 0.26 mL per median Gemini prompt.
~7.7B gal
consumed by its data centers in 2024 (6.1B in 2023)
0.26 mL
per median Gemini prompt, official 2025 disclosure (cooling)
0.24 Wh
electricity per median Gemini prompt (official)
Google is the most transparent of the large AI operators, which mostly means its numbers get argued about the most. Its 2025 environmental report puts its data centers' water consumption at about 7.7 billion gallons for 2024, up from 6.1 billion in 2023: roughly the annual household water use of a US city of 250,000 people.
In 2025 Google also published the most detailed official per-prompt figures yet, with a published methodology: a median Gemini Apps text prompt uses 0.24 Wh of electricity, 0.26 mL of water, and 0.03 g CO₂e. Those are real measurements, and they count the median prompt and on-site water, close to our Low boundary. Critics noted the median hides long prompts, reasoning modes and image generation; Google's own per-site disclosures show how local the story gets: its Council Bluffs, Iowa campus consumed about a billion gallons in 2024, while its Pflugerville, Texas site used roughly ten thousand.
That last contrast matters more than any average: cooling design and local climate can move a data center's water use by five orders of magnitude. It is why this site's state pages track where capacity gets built, not just how much.
Gemini is the one model in our calculator with an official override: its Mid energy value uses Google's disclosed figure converted to our per-token basis. Every other model rides on benchmark classes.
Your number
What does your AI actually use?
Pick your model, set your usage, get the number, with sources.
Sources
Cited on this page, in order of appearance.
- 1Google (2025). Google 2025 Environmental Report. Calendar-2024 data: ~7.7B gal consumed by Google data centers (~8.1B gal company-wide, +28%); the widely quoted 6.1B gal is the 2023 data-center figure. Per-site disclosures include Council Bluffs, Iowa (~1B gal, the most of any Google site) and Pflugerville, Texas (~10,000 gal). (accessed 2026-09) official disclosure
- 2Google (2025). Measuring the environmental impact of AI inference. Google Cloud technical disclosure: 0.24 Wh / 0.26 mL / 0.03 gCO₂e per median Gemini Apps prompt. (accessed 2026-06) official disclosure
- 3Shehabi, A., Smith, S. J., Hubbard, A., et al. (2024). 2024 United States Data Center Energy Usage Report. Lawrence Berkeley National Laboratory, LBNL-2001637: 176 TWh electricity and 17B gal direct water in 2023, with 2028 projections. (accessed 2026-06) government